Turnkey acquisition opportunity

SEN PYRO:
Circular Energy
Industrial Platform
in Senegal

A waste-to-value pyrolysis facility for tires and end-of-life plastics in Thiès.

Developed by Powerland Energy Group.

Initiate POF (Bank-to-Bank)

Reserved for qualified institutional investors · Project visualization

Immediate profitability in a high-demand circular economy market

Projected economics for the SEN PYRO turnkey platform.

USD 12M

Total turnkey CAPEX

No hidden costs

128 t/day

Processing capacity

Tires and end-of-life plastics

13.26B CFA

Projected Year 3 revenue

12.65B CFA

Projected Year 3 EBITDA

Under 1 year

Estimated payback

Conservative scenario

18 months

Order to commissioning

Starting 2027

Revenue, EBITDA and payback are projections, not realized operating results.

Locally anchored and de-risked in Thiès

Thiès, Senegal · Illustrative project imagery

Institutional backing

The Mayor and local authorities support plant construction.

Secured land

A 10-hectare plot is included, with the purchase price negotiated and notary fees covered.

Validated value chain

Waste suppliers and buyers of finished products have been identified.

Nationwide scalability

A standardized model replicable across Senegal and Africa, with other secured land plots and the capacity to build 15 plants over 10 years.

Information on the Senegal project is released after POF validation. Visits to communes and land, and meetings with local partners in Senegal, are open without further restriction once POF is validated.

Meeting with the architect in charge of implementing the PC for the plant and school construction.

A turnkey package with zero hidden costs

Full EPC included

Civil works, assembly and grid connection, saving 10-20% vs. standard competitors.

Long-term protection

5 years of preventive maintenance and a 10-year machinery breakdown warranty.

100% local hiring

A 60-day training program supervised by our engineers.

USD 600,000 social fund

A 50-classroom school and scholarships for employees' children.

Visits covered

Visits are confirmed only after qualification, irrevocable proof of funds, and payment of the first tranche following irrevocable commitment. Visas, travel and related costs are covered for visits to plants in China, Africa, and operating plants in Europe.

Competitive CAPEX

USD 93,750 per t/day

Up to about 4.5 times lower than a reference EU plastic pyrolysis project, with land, EPC, maintenance and warranty included.

Base pack: 1 reactor of 60 t/day + 8 distillation units (128 t/day total throughput), 10 ha land, 5-year maintenance, 10-year warranty.

Included in the Powerland offer

Standard competitors

Land, 10 ha (USD 120,000, notary included)

Often not included or extra

Full EPC

Billed separately (10-20% of CAPEX)

5-year preventive maintenance

Paid option or separate contract

10-year breakdown warranty

1 to 2 years maximum

USD 600,000 social fund

Not included

60-day training and local recruitment

Paid option

Optional energy expansion with Senelec

+USD 20M

Doubled capacity

A new pyrolysis reactor takes total capacity to 256 t/day.

Green energy mix

A 1 MWp ground-mounted solar plant and a 100 t/day biomass unit for self-consumption.

Direct sale to Senelec

Biomass power and surplus solar sold to Senegal's National Electricity Company under a negotiable PPA.

Illustrative energy expansion · PPA terms negotiable

Financial security and proven governance

Illustrative energy-sector imagery

Milestone-based payments are triggered by verified EPC progress and commissioning.

US bank accounts with Lead Bank, full ISO 20022 compliance and strict federal KYC/AML standards.

About 140 MW across 3 continents

Powerland Energy Group, founded in 2017.

90 MW

Solar PV

30 MW

Biomethane

20 MW

Hydro

A 3-step acquisition process

Investment capacity is validated before confidential project access.

NCNDA

A non-circumvention and non-disclosure agreement, signed without a notary. Signing it opens the process.

Proof of Funds (POF) and KYC

Formal Bank-to-Bank validation (SWIFT MT199, RWA, or BCL) confirming investment capacity and the lawful origin of funds, with mandatory investor qualification (KYC). Once validated, access opens to:

  • The technical and financial dossier and the Senegal project information
  • Local meetings, the architect, and visits to communes and land
  • Identities of industrial partners, once the NCNDA and POF are validated

Notarized sales contract and plant visits

Once the factory purchase is validated, the international sales contract is signed before a notary, before the first payment phase. A secure Data Room with technical audits, production videos and US bank details. Visits to plants in China and locally follow the notarized signing and are confirmed only after payment of the first phase. Visas, travel and related costs are covered for visits to plants in China, Africa, and operating plants in Europe.

Qualified investors

Interested in acquiring the SEN PYRO turnkey platform?

Under the Joint Venture Agreement with industrial partners, no follow-up is given without prior Bank-to-Bank Proof of Funds validation (SWIFT MT199, RWA, or BCL). Investor qualification is mandatory. Industrial partner entities are disclosed only after NCNDA validation and POF validation. All information on the Senegal project is released after POF validation.